Q4 2026 scorecard
Last updated 2026-11-10 — November is a partial month
All actuals are current through Nov 10. The DOR sheet, networking calendar and the roofer pipeline were re-verified Nov 10. Revenue was re-verified Nov 10. Reviews: 924 total, up 65 in Q4 from the 859 baseline (verified Nov 10). Location breakdown: Fairhope 866, Mobile 25, Louisiana 8, Florida 8, Kentucky 11, Montgomery 6. Roofer pipeline is at 379 leads for Q4.
Production output
442 completions
Targets set
4 of 7 metrics
Reporting status
Q4 in progress
Roofer Pipeline
Source: HighLevel — Roofer Lead Triage
2026 by month
Counts: DOR sheet • Revenue: QuickBooks (cash basis)
| Month | Home insp. | Roofs | Golds | Renewals | Energy | Revenue |
|---|